N2 - Managing stakeholders is relevant for project management, as they affect project results. Likewise, the support of a Project Management Office (PMO) improves these results. This study analyzes the positive influence of stakeholder management on project results, specifically on the likelihood of concluding projects within the predicted time and cost, together with the moderating effect of PMOs. A conceptual model was validated through logistic regression, with data collected through a survey responded by 216 experienced professionals studying in graduate programs on project management. Findings indicate that stakeholder management improves project results in terms of time and cost and confirm that PMO enhances the influence of stakeholder management on these results. As its contribution, the study reinforces stakeholder management and PMO as key elements for successful project management. Sampling was sufficient for research replicability but restricted to professionals of project management living in Peru. Thus, future studies could target a broader population.
AB - Managing stakeholders is relevant for project management, as they affect project results. Likewise, the support of a Project Management Office (PMO) improves these results. This study analyzes the positive influence of stakeholder management on project results, specifically on the likelihood of concluding projects within the predicted time and cost, together with the moderating effect of PMOs. A conceptual model was validated through logistic regression, with data collected through a survey responded by 216 experienced professionals studying in graduate programs on project management. Findings indicate that stakeholder management improves project results in terms of time and cost and confirm that PMO enhances the influence of stakeholder management on these results. As its contribution, the study reinforces stakeholder management and PMO as key elements for successful project management. Sampling was sufficient for research replicability but restricted to professionals of project management living in Peru. Thus, future studies could target a broader population.
KW - Prescriptive stakeholder management
KW - Project management office
KW - Project results
KW - Relational stakeholder management
UR - http://www.scopus.com/inward/record.url?scp=85142268020&partnerID=8YFLogxK
U2 - 10.1590/S0034-759020220606
DO - 10.1590/S0034-759020220606
M3 - Article
AN - SCOPUS:85142268020
SN - 0034-7590
VL - 62
JO - RAE Revista de Administracao de Empresas
JF - RAE Revista de Administracao de Empresas
IS - 6
M1 - e2020-1077
ER -