TY - GEN
T1 - Analog signal processing solutions for particle physics detectors
T2 - 2013 IEEE International Symposium on Circuits and Systems, ISCAS 2013
AU - Fora, D. Gascon
AU - Picatoste, E.
AU - Beteta, C. Abellan
AU - Grauges, E.
AU - Garrido, L.
AU - Vilasis-Cardona, X.
AU - Machefert, F.
AU - Duarte, O.
AU - Lefrancois, J.
PY - 2013
Y1 - 2013
N2 - Two solutions for the analog signal processing of a particle detector, the foreseen upgrade of the LHCb calorimeter, are presented. High precision measurements and low noise are required for a signal transmitted over 12 meter cables that spills over the following clock cycle. One solution, cast in an ASIC, uses an active termination over the cable transmission line and a dual channel integration scheme to solve the integrator discharge problem. The other solution modifies slightly the actual configuration using delay lines to reflect the signal from one clock cycle and subtract it from the next. It is implemented using comercial out-of-the-shelf components.
AB - Two solutions for the analog signal processing of a particle detector, the foreseen upgrade of the LHCb calorimeter, are presented. High precision measurements and low noise are required for a signal transmitted over 12 meter cables that spills over the following clock cycle. One solution, cast in an ASIC, uses an active termination over the cable transmission line and a dual channel integration scheme to solve the integrator discharge problem. The other solution modifies slightly the actual configuration using delay lines to reflect the signal from one clock cycle and subtract it from the next. It is implemented using comercial out-of-the-shelf components.
UR - http://www.scopus.com/inward/record.url?scp=84883329447&partnerID=8YFLogxK
U2 - 10.1109/ISCAS.2013.6572030
DO - 10.1109/ISCAS.2013.6572030
M3 - Conference contribution
AN - SCOPUS:84883329447
SN - 9781467357609
T3 - Proceedings - IEEE International Symposium on Circuits and Systems
SP - 1051
EP - 1054
BT - 2013 IEEE International Symposium on Circuits and Systems, ISCAS 2013
Y2 - 19 May 2013 through 23 May 2013
ER -